Condo EV Charger Installation
No Red Tape. No Board Battles. Just Certified Power.
Buying an electric car is easy. Charging it in a high-rise or townhouse complex? That can feel impossible.
You are likely staring at a confusing application form, hearing "no" from your Property Manager, or being told the building "doesn't have enough power."
We bridge the gap between you and your Condo Corporation. We don't just run wires; we provide the engineering data, the Load Management plans, and the insurance paperwork that Boards need to see to say "Yes."
Get Your Free QuoteThe Challenge: "Common Elements" & Power Limits
In a single-family home, you own the wall. In a condo, the parking garage is a Common Element. You can't just drill a hole.
Condo Boards have two main fears:
- "We don't have enough power." They think if everyone gets an EV, the building's main transformer will blow.
- "Who pays for it?" They don't want other residents subsidizing your electricity.
We Solve Both:
We Use EVEMS (DCC-9): We install Electric Vehicle Energy Management Systems. This allows us to tap into your specific unit's meter. It monitors power usage in real-time. If your stove and dryer are running, it pauses the charger. The result? Zero strain on the building's main grid.
We Enable Sub-Metering: If we can't use your meter, we install revenue-grade meters so you pay exactly for what you use. Zero cost to the neighbours.

Our "Board-Ready" Approval Process
Step 1: The Site Visit & Load Analysis
We inspect the electrical room and your parking spot. We calculate the voltage drop and conduit run distance.
Step 2: The Proposal Package
We don't just give you a price. We give you a Board Approval Package. This includes the scope of work, the ESA license details (7016895), WSIB clearance, and the technical specs. You hand this to your manager, and it answers all their questions.
Step 3: The "Section 98" Agreement
Most Boards require a standard alteration agreement. We provide the technical details to populate this legal document, ensuring the liability is covered.
Step 4: Installation & ESA Certification
Once approved, we install the conduit (often needing concrete coring or x-rays). We pull the permit and provide the final Certificate of Acceptance to close the file with management.
Who Pays for What? (The Cost Breakdown)
Transparency is key. In most GTA condos, the cost falls into two buckets.
1. The Resident Pays (Exclusive Use)
If the charger is for your personal deeded spot, you typically pay for the installation and the charger itself. Since this involves running armoured cable through concrete walls across a garage, prices are higher than standard home installs ($3,000 - $6,000+ is common depending on distance).
2. The Corporation Pays (Shared Infrastructure)
If the Board wants to install shared Level 2 chargers in visitor parking, the Corporation pays. We help Boards apply for government incentives (like ZEVIP) to offset these infrastructure costs.
Brands That Work for Condos
Not every charger works in a concrete garage. You need durability and smart connectivity.

Flo (CoRe+)
The gold standard for shared condo charging. Extremely rugged.

ChargePoint (Commercial)
Excellent for tracking usage and billing tenants.
Also Available: Wallbox (Compact) and DCC-9 (Load Managers).
Frequently Asked Questions
Can the Condo Board deny my request?
How long does it take?
Do I need to upgrade my panel?
Start Your Application Today
Don't fight the Board alone. Bring in the experts who have installed hundreds of units in high-rise and multi-unit buildings across the region.